Taco zone controls to achieve total system integration. Wire recommended for 120 vac connections 14 22 gauge wire for thermo stat connections and 14 22 gauge wire for 24 vac source connections.

Zh 7733 Taco 006 Circulator Wiring Diagram Download Diagram
Taco zvc406 wiring diagram. Zvc406 exp 6 zone valve control with priority and 2 powerports plug in powerport cards for use with all exp controls. The taco zone controls to achieve total system integra tion. Matter the application taco now provides the products to maximize system performance while simplifying both instal lation and service. This controller permits setting zone 3 to a priority setting that stops other zones for up to one hour such as to assure providing domestic hot water in an indirect fired water heater. When using alternative wiring diagram wiring instructions must be followed so power originates from the boiler aquastat. Taco zone valve wiring voltage and water flow tested and provedthe water in the top falls through.
December 20 2013 plant id 9300 2879 instruction sheet zvc406 zone valve control warning. Use copper wire only. Taco zvc403 zone valve control pdf 2010 zvc403 zvc406 zone control wiring conected with system pump wiring installation instructions. Product number transformer max output dimensions of enclosure number of zones voltage at 24 vac width height depth. Taco zone controls wiring guide pages switching relays single zone wiring 2 2. Ac service tech llc 43619 views.
Taco zone controls wiring guide pages switching relays single zone wiring 2 12 switching relays non exp connected together with priority 3 19. External indicator lights simplified wiring works with 2 3 or 4 wire zone valves compact design fuse protected 100 factory tested. Product number transformer max output dimensions of enclosure number of zones voltage at 24 vac width height depth zvc406 6 with priority 120 vac input 80 va 113 47 1 23. Product number transformer max output dimensions of enclosure number of zones voltage at 24 vac width height depth. 120 vac wiring must have a minimum temperature rating of 75c. Failure to follow this.
February 1 2013 effective. No matter the application taco now provides the products to maximize system performance while simplify ing both installation and service. The taco zone controls to achieve total system integra tion. No matter the application taco now provides the products to maximize system performance while simplifying both instal lation and service. March 1 2013 effective. No matter the application taco now provides the products to maximize system performance while simplify ing both installation and service.
Failure to follow these wiring instructions may result in a secondary source of power. Wiring connections must be made in accordance with all applicable electrical codes. Zvc406 6 zone valve control with priority. Instruction sheet zvc406 exp 4 zone valve control 102 367 supersedes. December 20 2013 plant id 9300 2881 this device complies with part 15 of the fcc rules.